One unique challenge of this job was the steep grade BHT had to navigate to bring the turbine pieces and crawler crane to the site. The road was at a 8-10% grade, a level at which some of our traditional hauling equipment isn’t cleared for. This meant our BHT team utilized their two new Goldhofer trailers for the job.